Case Studies

 College Station Shopping Center
 Lexington Terrace Business Center
 Lexington Terrace Rite Aid Store
 Dulles Business Park

BCI Case Study:
Lexington Terrace Business Center

Size: Rectangular three-story office building, 41,638 SF

Site: Located in the proposed development of New Lexington Terrace

Labor: Non-Union, Davis Bacon Wage Rates

Schedule: July 1998 - March 1999

Outline Specifications

Site: Utilities, lighting, parking lot for 144 cars, perimeter brick walls along West Saratoga Street and Martin Luther King Blvd., ornamental fencing along West Mulberry Street, and landscaping.

Foundation: Reinforced concrete footings with concrete masonry foundation walls; six-inch thick concrete reinforced slab at grade.

Superstructure: Exterior walls will be predominately constructed of 4-inch brick veneer over light-gauge steel framing.

Facade: Exterior walls, comprised of brick masonry veneer, exterior insulation and finish system (EIFS) and pre-finished aluminum window and store front curtain wall systems.

Roof: Ballasted, adhesive applied elastomeric membrane (E.P.D.M.) type roofing system over tapered rigid insulation; protective roof walkway pads are also specified.

Finishes: Floors will be finished with quarry tile, quarry base tile, vinyl tile, vinyl cove base, carpet and ceramic tile. Walls will be predominately painted gypsum board, vestibule walls with brick veneer, toilet rooms with ceramic tiles. Ceilings will be predominately acoustical ceiling tile.

Fire Protection: Hydraulically designed automatic wet pipe fire suppression system; fire alarms, smoke protection and portable fire extinguishers will also serve as fire protection devices.

Plumbing: Services include domestic water, sanitary sewer and natural gas. Four gas meters serving the rooftop.

HVAC: Six roof mounted gas/electric air handling units

Electrical: Transformer 480/277 V, 3-phase, 4-wire.

Project Hard Cost Synopsis

 
Cost
Cost/SF
General Conditions
$384,000
or
9.22
Sitework
323,324
or
7.77
Concrete
173,415
or
4.16
Masonry
230,610
or
5.54
Metals
533,972
or
12.82
Carpentry
33,040
or
0.79
Thermal/Moisture Protection
123,369
or
2.96
Doors and Windows
128,643
or
3.09
Finishes
216,890
or
5.21
Specialties
31,079
or
0.75
Equipment
5,779
or
0.14
Furnishings
12,780
or
0.31
Elevators
79,200
or
1.90
Mechanical
520,435
or
12.50
Electric
203,892
or
4.90
Performance & Payme