 |
acquistare cialis in farmacia cialis generico online
Physical Needs Assessment/Cost over Term (PNOT)
A Physical Needs Assessment/Costs Over the Term scope performed by Building
Consultants, Inc. (BCI) includes the following:
Investigation of the facility including:
- A site visit to the site and building(s), making arrangements with the
borrower or property manager for access to secure common areas and a
representative sample of the total units; we assume a representative sample can
be achieved by visiting 10% of the total units however if significant additional
units must be observed additional charges may be required
- At the time of the site visit interview tenants, property manager,
maintenance personnel and/or contractors to determine history of the project,
maintenance schedules, recently provided repairs, proposed work
- Take photographs of the project including:
- Overall project views
- Typical site elements such as parking lots, tot lots, exposed utility
elements, drainage issues if any
- Major building elevations
- Views of the roof(s) with details of significant features
- Detail pictures of major building exterior elements such as entrances,
windows, utility entrances
- Overall views of major common areas
- Overall view of typical dwelling unit rooms
- Typical pictures of plumbing fixtures, appliances, equipment
- Typical pictures of HVAC equipment, elements
- Typical pictures of electrical service panels, switchgear, emergency safety
equipment
- Pictures of deficiencies noted in the body of the report
- Major atypical elements if any
- Investigate the property for significant deficiencies in the major systems
which are identified as either Emergency or Immediate Physical Needs in the
written report
- Site (drainage, paved areas, utilities, amenities)
- Architectural (structural, building envelope, base building and/or common
area interior finishes)
- Interior/Dwelling units (layout, finishes, equipment, mechanical/electrical)
- Mechanical (elevators, plumbing, HVAC, fire suppression sprinkler) and
electrical (service, power, lighting, security, emergency)
- Provide an initial verbal report to the client summarizing the overall
impressions of the facility within 24 hours of the site visit
- Reviewing the existing systems with industry standard or the Fannie Mae
Expected Useful Life Tables, indicating the point during the term when the
repair/replacement would be required, incorporating an inflation rate and
determining the costs over the specified term for the major repair and
replacement items.
Provide an initial verbal report to you summarizing the overall impressions
of the facility within 24 hours of the site visit and provide a written
report.
|
 |