 |
Condition Field Report
A Condition Deficiency Survey conducted by Building Consultants, Inc. (BCI)
consists of the following:
- A site visit to the site and building(s), making arrangements with the
borrower or property manager for access to secure common areas.
- Evaluate the following major systems for significant deficiencies:
- Site (drainage, paved areas, utilities, amenities)
- Architectural (structural, building envelope, base building interior
finishes)
- Interior (layout, finishes, equipment, mechanical/electrical)
- Mechanical (elevators, plumbing, HVAC, fire suppression sprinkler) and
Electrical (service, power, lighting, security, emergency)
- Provide an initial oral report to the client summarizing the overall
impressions of the facility within 24 hours of the site visit.
- Provide a brief hand-written report in tabular form including a brief
description of the project and property and the observed deficiencies checklist
for the following major systems:
- Site (drainage, paved areas, utilities, amenities)
- Structural (Foundation, substructure, superstructure)
- Enclosure (exterior walls, insulation, windows and doors, roofing)
- Partitions and Interior Doors
- Finishes (flooring, walls and ceilings)
- Conveying Systems (elevators and escalators)
- Mechanical, Electrical and Plumbing (plumbing, HVAC, fire suppression
sprinkler electrical service, power, lighting, security, emergency)
- Accessibility (general observations of site and building provisions, not a
code review)
- Labeled photographs (12 to 20) depicting the overall property, typical
conditions and significant deficiencies at the time of the site visit
|
 |